ON TIME PERFORMANCE

Background

As recently as 2013, Regional Rail on-time performance (OTP) was above 90% consistently for all Lines and offered the levels of service reliability expected by our customers. At the beginning of Calendar 2014, starting with severe weather episodes in January, OTP began to slip - a trend that continued into 2015. In 2016, Regional Rail service began moving back closer towards the 90% mark and then the Authority faced a series of significant events - Silverliner V fleet defect, the onset of Slippery Rail season, the recent Transit Service Interruption and full scale rollout of Positive Train Control - that disrupted service and schedules. A railroad like ours with a unique run-through arrangement in Center City (no terminals) and the numerous single track sections that trains are operated through is sensitive to conditions like these. The OTP dropped sharply to numbers that we never wanted customers to experience.

After asking ourselves some hard questions and taking steps to realign and reinvigorate our Regional Rail Department, we have a program working to turn OTP around. Schedule changes essential to this turnaround will be in effect on December 11, 2016. There are still more service improvements as you will see in the schedule change that went into effect on Sunday, January 29, 2017.

Improving service reliability is our business commitment to customers but we will never make any change that sacrifices on safety. Through this comprehensive Regional Rail Service Improvement Program we are working to create the balance to enhance reliability and ensure the safety of our customers and employees.

The tables below represent the On-Time Performance Report, with a callout for major events that impacted service for each Regional Rail Line. We are not where we want to be just yet, but this is an important start and we continue to focus on the issues that have had the most significant impact on service. With the deployment of Positive Train Control now substantially complete we can make the service and schedule adjustments needed to improve OTP across our Regional Rail network.

Current Update

Since the launch of the microsite, Regional Rail has implemented three schedule changes (December 11, 2016, January 29, 2017 and April 23, 2017) to begin addressing late train issues, service operations under Positive Train Control, as well as potential schedule conflicts due to the level of traffic out on the system and the number of Regional Rail Lines that share the same track.

The tables below present a "by week" view of our Monthly On-Time Performance Report, with a callout for major events that impacted service for each Regional Rail Line. The December report covered the 3 weeks in December following the schedule change on 12.11.16. The January OTP Report also includes the first two weeks in February as an early indicator of the service improvements expected as a result of the 01.29.17 timetable change. Over a two day period during the week of February 6, Regional Rail service achieved 92% and 88% OTP, which indicates that things are getting better. The challenge now will be establishing service consistency and a return to OTP at 90% for all Lines. To meet this goal, we continue to look at schedules, train performance, and feedback from customers to make further refinements for upcoming schedule changes including the next timetable change that went into effect on Sunday, April 23, 2017.


December 2016 January 2017 February 2017 March 2017
April 2017 May 2017



May 2017

WEEK
LINE: 4/30/17 -
5/6/17
5/7/17 -
5/13/17
5/14/17 -
5/20/17
5/21/17 -
5/27/17
%
On-Time
%
On-Time
%
On-Time
%
On-Time
Airport 96%
95% 86% 94%
Chestnut Hill East
88% 89% 85% 89%
Chestnut Hill West
90% 89% 87% 89%
Cynwyd
93% 93% 92% 94%
Fox Chase
95% 92% 89% 91%
Lansdale/Doylestown 89% 87% 75% 90%
Manayunk/Norristown 91% 91% 90% 92%
Media/Elwyn 91% 93% 88% 96%
Paoli/Thorndale 77% 83% 76% 86%
Trenton 87% 81% 77% 85%
Warminster 92% 87% 81% 90%
West Trenton
90% 95% 85% 91%
Wilmington/Newark 82% 83% 77% 72%*
Totals
89% 89% 83% 89%
Major Impacts to Service
Amtrak Dispatching & Scheduling
Amtrak Travel Delays
Train Congestion Delays
Travel Delays
Amtrak Travel Delays
Scheduled Project Delays
Amtrak Dispatching & Scheduling
Miscellaneous Incidents
Switch/Signal Problems
Amtrak Dispatching & Scheduling
Catenary/Signal Problems
Secondary Delays due to Equipment Problems
Amtrak Dispatching & Scheduling
Switch/Signal Problems
Amtrak Track/Bridge Problems
Amtrak Travel Delays

*Weekday and Saturday & Sunday Amtrak construction on the Wilmington/Newark Line May - July, 2017



April 2017

WEEK
LINE: 4/2/17 -
4/8/17
4/9/17 -
4/15/17
4/16/17 -
4/22/17
4/23/17 -
4/29/17
%
On-Time
%
On-Time
%
On-Time
%
On-Time
Airport 90% 92% 94% 92%
Chestnut Hill East
79% 83% 92% 91%
Chestnut Hill West
91% 88% 92% 88%
Cynwyd
92% 93%
95% 89%
Fox Chase
92% 90% 95% 93%
Lansdale/Doylestown 75% 83% 82% 81%
Manayunk/Norristown 86% 91% 91% 89%
Media/Elwyn 93% 95% 92% 96%
Paoli/Thorndale 79% 85% 77% 76%
Trenton 86% 80% 86% 88%
Warminster 87% 82% 86% 88%
West Trenton
93% 89% 86% 92%
Wilmington/Newark 77% 83% 87% 74%
Totals
85% 87% 88% 87%
Major Impacts to Service
Weather Related
Delays
Travel Delays
Train Congestion
Delays
Scheduled Project
Delays
Switch/Signal Problems
Amtrak Dispatching & Scheduling
Travel Delays
Train Congestion Delays
Switch/Signal Problems
Secondary Delays Due to
Equipment Problems
Train Congestion Delays
Travel Delays
Amtrak Travel Delays
Travel Delays (NFL Draft)
Amtrak Dispatching &
Scheduling
Train Congestion Delays



March 2017

WEEK
LINE: 2/26/17 -
3/4/17
3/5/17 -
3/11/17
*3/12/17 -
3/18/17
3/19/17 -
3/25/17
3/26/17 - 4/1/27
%
On-Time
%
On-Time
%
On-Time
%
On-Time
%
On-Time
Airport 94% 90% 80% 95% 91%
Chestnut Hill East
80% 83% 74% 92% 87%
Chestnut Hill West
91% 88% 78% 90% 92%
Cynwyd
92% 96%
82% 94% 93%
Fox Chase
91% 87% 83% 92% 93%
Lansdale/Doylestown 85% 83% 57% 85% 80%
Manayunk/Norristown 91% 85% 75% 86% 93%
Media/Elwyn 94% 91% 76% 92% 97%
Paoli/Thorndale 82% 78% 56% 81% 82%
Trenton 78% 83% 66% 83% 90%
Warminster 88% 89% 73% 90% 86%
West Trenton
88% 88% 72%
89% 90%
Wilmington/Newark 84% 82% 68%
82% 84%
Totals
87% 86% 71% 88% 88%
Major Impacts to Service
Amtrak Issues/Dispatching & Scheduling
Train Congestion Delays
Switch/Signal Problems
Catenary/Signal Problems
Amtrak Dispatching & Scheduling
Equipment Problems
Crew/Manpower Issues
Travel Delays
Weather Related Delays
Flower Show Travelers
Amtrak Dispatching/Scheduling
Travel Delays
Train Congestion Delays
Switch or Signal Problems
Train Congestion Delays
Scheduled Project Delays
Amtrak Dispatching & Scheduling

*Impacts to service during Winter Storm Stella (Tuesday, March 14, 2017)



February 2017

WEEK
LINE: 1/29/17 -
2/4/17
2/5/17 -
2/11/17
2/12/17 -
2/18/17
2/19/17 -
2/25/17
%
On-Time
%
On-Time
%
On-Time
%
On-Time
Airport 92% 92% 95% 94%
Chestnut Hill East
82% 84% 87% 88%
Chestnut Hill West
88% 86% 90% 88%
Cynwyd
94% 94% 90% 98%
Fox Chase
86% 87% 87% 88%
Lansdale/Doylestown 76% 80% 87% 84%
Manayunk/Norristown 88% 89% 89% 90%
Media/Elwyn 85% 90% 91% 94%
Paoli/Thorndale 72% 80% 82% 82%
Trenton 74% 78% 82% 84%
Warminster 87% 87% 90% 87%
West Trenton
82% 90% 92% 88%
Wilmington/Newark 79% 81% 81% 82%
Totals
82% 85% 88% 88%
Major Impacts to Service
January 29th Schedule Change
Travel Delays
Train Congestion
Amtrak Delays
Switch/Signal Problems
Service During Severe
Winter Storm/Below Freezing
Temperatures
Crew/Manpower Problems
Amtrak Delays
Train Congestion Delays
Equipment Problems
Amtrak Delays
Train Congestion Delays
Switch/Signal Problems
Misc. Incidents
Switch/Signal Problems
Amtrak Delays
Crew/Manpower Problems
Amtrak Dispatching/Scheduling



January 2017

WEEK
LINE: 1/1/17 - 1/7/17
1/8/17 - 1/14/17
1/15/17 - 1/21/17
1/22/17 - 1/28/17 *1/29/17 - 2/4/17
**2/5/17 - 2/11/17
%
On-Time
%
On-Time
%
On-Time
%
On-Time
%
On-Time
%
On-Time
Airport 96%
88% 89% 87%
92% 92%
Chestnut Hill East
86% 79% 84% 78% 82%
84%
Chestnut Hill West
87% 80% 84% 83% 88% 86%
Cynwyd
86% 81% 85% 87% 94% 94%
Fox Chase
91% 87% 84% 84% 86% 87%
Lansdale/Doylestown 77% 74% 69% 69% 76% 80%
Manayunk/Norristown 84% 80% 82% 77% 88% 89%
Media/Elwyn 73% 80% 82% 66% 85% 90%
Paoli/Thorndale 75% 72% 67% 61% 72% 80%
Trenton 84% 79% 82% 78% 74% 78%
Warminster 94% 86% 87% 84% 87% 87%
West Trenton
78% 76% 75% 67% 82% 90%
Wilmington/Newark 78% 71% 78% 75% 79% 81%
Totals
84% 79% 80% 76% 82% 85%
Major Impacts to Service
Heavy Travel
Delays on Amtrak Territory
Crew Shortages
Winter Related Delays
Heavy Travel
Delays on Amtrak Territory
Equipment Issues
Heavy Travel
Delays on Amtrak Territory
Equipment Issues
Heavy Travel
Delays on Amtrak Territory
Switch and Signal Issues
Travel Delays
Travel Congestion
Amtrak Delays
Winter Storm
Crew Shortages
Equipment Issues
Amtrak Issues

*Early Snapshot After January 29th Schedule Change
**Service during severe winter storm, below freezing temperatures (Thursday, February 9, 2017)


December 2016

WEEK
LINE: 12/11-12/16 12/18-12/24 12/25-12/31
% On-Time
% On-Time % On-Time
Airport 91%
88% 95%
Chestnut Hill East
87% 85% 88%
Chestnut Hill West
85% 90% 88%
Cynwyd
83% 48%* 88%
Fox Chase
87% 91% 94%
Lansdale/Doylestown 73% 70% 78%
Manayunk/Norristown 79% 84% 89%
Media/Elwyn 76% 86% 87%
Paoli/Thorndale 69% 74% 81%
Trenton 76% 77% 84%
Warminster 87% 82% 90%
West Trenton
71% 73% 83%
Wilmington/Newark 75% 75% 82%
Totals
80% 80% 87%
Major Impacts to Service
Schedule Change
Switch & Signal Issues
Catenary Power Issues
Heavy Travel
Catenary Power Issues
Crew Shortages
Delays on Amtrak Territory
Heavy Travel
Crew Shortages
Switch & Signal Issues

*PM Service suspended on Cynwyd Line 12.19-12.22 due to crew shortages. Bus Shuttle service provided between Overbrook Station and Cynwyd Line Stations